Skip to content
NECA
  • About
    • Background
    • Mission Statement
  • Scholarship Program
    • Scholarship Program
    • Program Administration
    • Eligibility
  • Contact
  • Current Jobs
    • Current Jobs
    • Training Request
  • Library
    • Heavy Highway
    • Pipeline
    • Vertical

NTUA Kayenta WWTP Sludge Drying Bed

Posted on July 28, 2025June 12, 2026 by Johnson Chee
Kayenta WWTP Sludge Drying Bed Drawing Package OptimizedDownload
Kayenta WWTP Sludge Drying Bed Spec PackageDownload

Posted in Pipeline, Projects

Post navigation

Previous: N13(3 3)1,4 Road Project Red Valley
Next: NTUA Coalmine Lift Station

Related Posts

  • Pipeline
  • Projects

Smith Lake Water System Improvements

  • Johnson Chee
  • February 14, 2022
  • 1 min read
  • 0

Well Site #1 Treatment Building

  • Pipeline
  • Projects

NGWSP BBN9 Reaches 10.1, 10.2 & 10.3

  • Johnson Chee
  • September 8, 2025
  • 1 min read
  • 0
  • Pipeline
  • Projects

Navajo Gallup Water Supply -Beacon Bisti N9 Reach 10.2.1

  • Johnson Chee
  • April 25, 2023
  • 1 min read
  • 0
  • Pipeline
  • Projects

COALMINE CANYON WWTP LAGOON REHABILITATION

  • Johnson Chee
  • October 7, 2024
  • 1 min read
  • 0
  • Facebook
  • LinkedIn
  1. Home
  2. Projects
  3. Pipeline
  4. NTUA Kayenta WWTP Sludge Drying Bed
  • Heavy Highway
  • Pipeline
  • Projects
  • Uncategorized
  • Vertical

Pages

Copyright © 2026 NECA
Navajo Engineering & Construction Authority
PO Box: 969 - Shiprock, NM - 87420