Skip to content
NECA
  • About NECA
    • Mission Statement
  • Scholarship Program
    • Program Administration
    • Eligibility
  • Current Jobs
    • Training Request
  • Library
    • Heavy Highway
    • Pipeline
    • Vertical

NDOT N8066(3)1,2&4 Road Project, Black Mesa, Arizona

Posted on April 17, 2026June 8, 2026 by Johnson Chee
Arch Culvert Geotech Design Memorandum Black MesaDownload
Geotech Investigation and Pavement Design ReportDownload
Geotechnical Investigation and Foundation Recommendation Report Task Order No. A15PD00791Download
N80663 RFP 04-16-26Download
N8066 Black Mesa PlansDownload
N8066 Black Mesa Contract BookDownload
N8066 Black Mesa XS 2026-0415Download
N8066 Legal Land SurveyDownload
Navajo DOT FLH STD DETAILSDownload
NTUA Technical Specs Matrials Construction Water Water Mar2002Download
Bid No.26 04 4099SB N8066 Addendum-1Download
Bid No. 26 04 4099SB Addendum 2 05.07.2026Download

Posted in Heavy Highway, Projects

Post navigation

Previous: NTUA Navajo (Red Lake) Sewer Lift Station
Next: NDOT 8084(1)1,2&4 Road Project Many Farms, AZ

Related Posts

  • Heavy Highway
  • Projects

NDOT 8084(1)1,2&4 Road Project Many Farms, AZ

  • Johnson Chee
  • May 14, 2026
  • 1 min read
  • 0
  • Heavy Highway
  • Projects

NDOT N9073(1)1,2&4 Blue Canyon Road

  • Johnson Chee
  • May 27, 2026
  • 1 min read
  • 0
  • Facebook
  • LinkedIn
  1. Home
  2. Projects
  3. Heavy Highway
  4. NDOT N8066(3)1,2&4 Road Project, Black Mesa, Arizona
  • Heavy Highway
  • Pipeline
  • Projects
  • Uncategorized

Pages

Copyright © 2026 NECA