Skip to content
NECA
  • About
    • Background
    • Mission Statement
  • Scholarship Program
    • Scholarship Program
    • Program Administration
    • Eligibility
  • Contact
  • Current Jobs
    • Current Jobs
    • Training Request
  • Library
    • Heavy Highway
    • Pipeline
    • Vertical

N13(3 3)1,4 Road Project Red Valley

Posted on July 2, 2025June 12, 2026 by Johnson Chee
N13 (3 3) RFP 6-16-25Download
N13 (3 3)contract-book 6-18-25Download
N13 (3 3) GEO-Technical Report Rev-2-signedDownload
N13 ROW mapDownload
N13 (3 3) 14 Bid Schedule 6-16-25 Download
NDOT Task 51 N13 Red Valley 100% Final Stamped Design PlansDownload
Bid No.-25-06-3737LE Addendum 1 07.03.2025Download
Bid No.-25-06-3737LE Addendum 2 07.07.2025Download
Posted in Heavy Highway, Projects

Post navigation

Previous: NDOT N12 Agency Line to Wheatfields Lake, AZ
Next: NTUA Kayenta WWTP Sludge Drying Bed

Related Posts

  • Heavy Highway
  • Projects

NDOT 8084(1)1,2&4 Road Project Many Farms, AZ

  • Johnson Chee
  • May 14, 2026
  • 1 min read
  • 0
  • Heavy Highway
  • Projects

NDOT 2646(1-2)N6460(1)1,2&4 ROAD IMPROVEMENT in DENNEHOTSO AZ

  • Johnson Chee
  • April 9, 2024
  • 1 min read
  • 0
  • Heavy Highway
  • Projects

NDOT – N27 Nazlini/Chinle

  • Johnson Chee
  • February 16, 2018
  • 1 min read
  • 0

N27 North and South_Specifications N27 North_Plans_with 10-3-18 revisions N27 South_Plans_with 10-3-18 revisions N27_Bid Schedule N27_AZ Labor Wages N27_Addendum No. 1 N27_Addendum No. 2

  • Heavy Highway
  • Projects

Tuba City Regional Health Care Corporation

  • Johnson Chee
  • May 19, 2022
  • 1 min read
  • 0
  • Facebook
  • LinkedIn
  1. Home
  2. Projects
  3. Heavy Highway
  4. N13(3 3)1,4 Road Project Red Valley
  • Heavy Highway
  • Pipeline
  • Projects
  • Uncategorized
  • Vertical

Pages

Copyright © 2026 NECA
Navajo Engineering & Construction Authority
PO Box: 969 - Shiprock, NM - 87420