Author: Jonathan

An enterprise of the Navajo Nation

NTUA Pinon Lagoon Expansion Project

NTUA_Pinon Lagoon Expansion_Scope Of Work NTUA_Pinon Lagoon Expansion_Plans 100% NTUA_Pinon WWTP Geotechnical Report  


January 29, 2020 0

Kayenta Commerical Lots

Kayenta Lots – Project Manual PH 1 Kayenta Lots – Plans PH 1 [Stamped]


December 24, 2019 0

N12(19-4) Tsaile/Wheatfields – RE-BID PACKAGE

N12(19-4) Contract Book-Suppl Specifications 9-09-19 rev5_executed N12 Updated Final Construction Plans rev 4 10-24-19 N12(19-4) Geotechical Report N12 roadway Geotechnical Investigation Report Bid No Re-Bid 18-10-1940LE_Addendum 1_05-17-19 N12(18)1 BRDG N505 scan173 (1) N12(17) BRDG N504 (1)


May 8, 2019 0

NGWSP Cutter Lateral – Reach 21 100%

Cutter Lateral Reach 21_Technical Specifications – CONVEYANCE Cutter Lateral Reach 21_Plans – CONVEYANCE  


February 20, 2019 0

NTUA Halchita Water Treatment Plant

NTUA Halchita WTP_Electrical_100% Specifications NTUA Halchita WTP_Plans 100% NTUA Halchita WTP_Electrical Plans 100%_REVISED_1-23-19 NTUA Halchita WTP_Adedge Treatment System_Plans  


January 16, 2019 0

NGWSP Reach 26.3 – Ojo Encino South

NGWSP Reach 26.3 Technical Specs 100% Complete NGWSP Reach 26.3 Plans 100% Complete with Design Revisions 9-13-19    


October 2, 2018 0

N6330-N6331-N21 Kaibeto, AZ

RFP_N6330_N6331_N21_07-25-18 Contract and Suppl Specfs_N6330-N6331-N21_7-25-18 Plans N6330_N6331_N21 07-18-18 Geotechnical Report_N6330_N6331


July 26, 2018 0